The project involved the construction of a haul road rail overpass incorporating mechanically stabilised earth walls and a steel bridge deck spanning an operational railway.

The scope included the provision of all labour and concrete plant for the bridge deck pour, comprising 994.6 square metres of deck surface and a total concrete volume of 397.8 cubic metres.