The Brockman 4 ANFO project consists of the construction of a new Ammonium Nitrate (AN) facility, to enable decommissioning of an existing facility that sits within the future Brockman 4 mining area.

Melchor was engaged to supply and install temporary and permanent works to concrete elements including:

  • Formwork

  • Reinforcing

  • Concrete

  • Cast-in elements and fabrication

  • Installation of precast concrete panels

Melchor completed works alongside the Monadelphous team as a vertically integrated package.