Thornlie
PTA
NEWest Alliance
9 Months
Thornlie- Cockburn link will be Perth’s first East-West cross line connection.
Elliot Place and Cameron Street had become separated a passenger rail corridor. The new Elliot Place footbridge will reconnect these two residential streets.
The footbridge’s substructure consisted of large footings up to 100m3 each, beneath a series of plinths and 4m high deflection walls.
As the bridge site spans between two residential cul-de-sacs and the sunken rail corridor, space was at a premium and as such the superstructure elements were prefabricated and transported. Melchor constructed 22 precast ramps sections, each weighing approximately 35t. The bridge section is a continuous steel box truss, on which Melchor constructed the in-situ deck and ramp infills.
This scope showcased Melchor’s expertise in in-situ wall construction, precast elements and associated temporary works; much of which was gained during construction of various similar structures on the Yanchep Rail Extension Project.
We provide services that include head contracts, sub-contracting and labour hire to project owners, EPC contractors and Tier-1 civil contractors.
Get in TouchUnlock a world of diverse opportunities with a company that invests in their team’s growth and wellbeing.
Join our TeamMelchor Perth
1/3 McDonald Street West
Osborne Park, WA 6017
(08) 6110 1988
admin@melchor.com.au
Melchor Karratha
Lot 2534 Coolawanyah Rd
Karratha, WA 6714
Melchor Bunbury
9 Marchant Street
Davenport, Bunbury WA 6230