The Campus 2019 project comprises of the following areas of work:

  • Refurbishment of existing 7 Level (Ground +6) structure and the addition of 5 no. levels of new build (4 occupied + plant level).
  • Ground floor – Entry lobby and services/plant rooms.  Cold shell retail tenancies.
  • Mezzanine Level – Plant Room
  • Level 1-2 –  Hostel/Purpose Built Student Accommodation (PBSA) levels
  • Level 5-6 –  PBSA levels
  • Level 8-11 – PBSA levels
  • Level 12 – Plant level
  • Level 3, 4, 7 – No base build works (except life safety) – future fit out

Scope of Works:

  • Air and Watercooled VRF Air-conditioning System
  • Accommodation Tempered Outdoor Air
  • Communal Area Outdoor Air
  • Accommodation Toilet Exhaust System
  • Kitchen Ventilation Systems
  • Fire Rated Ductwork
  • Smoke Hazard Management
  • Switchboards
  • Controls
  • Power and Controls Cabling
  • Cooling Towers
  • Condenser Water Circulating System
  • Ventilation Plant
Project Details

Client

Broad Construction

Value

$4 million

Location

Perth, Western Australia

Completed

In Progress

Sector

Student Accommodation