NV Fragrance

Tier-one contractor, Probuild, have appointed Melchor Commercial to carry out the Design & Construction contract the NV Hotel & Apartment project at 374-396 Murray Street, Perth. The project in Perth’s evolving CBD will be made up of two towers: One 28-levels containing 433 hotel guest rooms, ground floor eatery and drink establishments. On the other,…

Woodside Fitout

Melchor were awarded the full electrical works for the CAT B fit out of the new 30 storey Woodside Headquarters building in the Perth CBD. The project consisted of the complete strip out of the existing CAT A installation and new installation of all new lighting, small power, data installation and UPS backed power to…

Claremont on the Park

Broad Construction awarded Melchor the combined Electrical and Hydraulic services contract for the Claremont on the Park Apartment project. Broad are operating for Mirvac to deliver 233 apartments including two basement car park levels and communal courtyard areas around the Claremont oval. Claremont by Mirvac is redefining sophisticated apartment living in the heart of Perth’s…

DHA Apartments

Melchor are proud to deliver a multi-services package comprising of all Electrical, Hydraulic, Fire and Mechanical services for Georgiou at Defence Housing Australia’s (DHA) Liv Apartments. The project in Fremantle valued at $61m is the largest single development recognised as a One Planet Community in Western Australia. The Liv Apartments’ project will transform a run-down…

The Crest Apartments

BGC awarded Melchor Commercial with the construct and commission contract for the Crest Apartments. The project is valued at $100 million, comprising of a 22-storey, mixed-use development. The Crest will feature 169 apartments with one, two or three bedrooms and owner-occupier focused amenities including a rooftop cinema, wet and dry kids’ play area and rooftop…

Purpose Built Student Accommodation

BGC awarded Melchor Commercial with the design and construct contract for PBSA Stirling Street, Perth’s first Purpose Built Student Accommodation building. The project is valued at $70 million. The building includes 189 apartments with 543 beds. Accommodation ranges from studio to six-bedroom apartments. Communal facilities, designed to encourage interaction and a positive learning environment, include the…

80 Stirling St

The Campus 2019 project comprises of the following areas of work: Refurbishment of existing 7 Level (Ground +6) structure and the addition of 5 no. levels of new build (4 occupied + plant level). Ground floor - Entry lobby and services/plant rooms.  Cold shell retail tenancies. Mezzanine Level - Plant Room Level 1-2 -  Hostel/Purpose…

Talison Tianqi Lithium – Stage 1

Georgiou engaged Melchor Contracting to supply all labour, plant and temporary works materials for the FRP package delivering 8,000m3 of concrete in a typical mining processing facility. This included 8 major structures up to 14m high with 2m suspended slabs. Project Details Project Owner Talison Tianqi Lithium Australia Client Georgiou Location Kwinana, Western Australia Completed…

Talison Tianqi Lithium – Stage 2

After the successful completion of Stage 1, Georgiou re-engaged Melchor Contracting to supply all labour, plant and temporary works and materials for the FRP package which encompassed 13,000m3 of concrete in a typical mining processing facility and 8 major structures up to 14m high with 2m suspended slabs. Project Details Project Owner Talison Tianqi Lithium…

Great Northern Connect – Noisewalls

Melchor Contracting were engaged to complete the installation of approximately 11km of noise walls. The works entailed a half split between CFA piling and bored piling footings installing the post, precast panel and acrylic panels. Melchor Contracting were able to develop a temporary works system that reduced the overall cost for the client by reducing…